In our workshop we have completed:
- a metal frame was made
- external finishing was done with painted false beams
- windows and an entrance door were installed
- water-resistant plywood + commercial linoleum were laid on the floor inside
- electricity was installed + an electrical panel, sockets and switches were installed
- walls and ceiling were insulated with mineral wool and covered with wooden paneling
- corrugated sheeting was installed on the roof + end strips + drainage system
Next:
- reinforced concrete foundation supports were installed on the site
- a small house was delivered and installed
- the small house was connected to electricity
- tidied up and the garbage was taken out