The customer already had a foundation made in the form of a reinforced concrete slab.
We have done the following:
- assembled and insulated the frame
- assembled and insulated the roof, covered it with metal tiles and installed snow guards,
- installed the roof lining and drainage system
- installed a chimney on which a cap was installed
- sheathed the chimney pipe with fireproof wool
- sheathed the walls and ceiling outside with false beams + glued rope to the corners
- installed 2 windows and an entrance door
- installed electrical and plumbing inside
- sheathed the walls and ceiling with clapboard
- assembled shelves in the steam room
- made a screed and laid tiles
- installed a toilet, boiler, shower and stove for the steam room itself
- installed doors to the bathroom and the steam room
- laid decking on the veranda and installed wooden railings
- laid paving slabs around the bathhouse
- finally cleaned up and took out the trash
If you want to view other photos from this property, as well as see our other works, go to our main website.