Sports buildings can have different types, regardless of their type. It can be an open (arena) or closed area, or a room in the form of a hall, equipped with equipment. Other types of closed type are futsal, swimming pool. Their main purpose is to provide clients with sports training, games and events related to sports. This industry is constantly developing, forming various types of new activities, including squash, bowling and others.
Such sports facilities necessarily need a room that is equipped with its own equipment, and where they equip convenient areas for events. Such facilities should be not only interesting and comfortable, but also safe for visitors. That is why it is especially important to properly design a sports complex in accordance with the norms of legislation and the requirements of the customer himself.
What is taken into account when planning and building sports complexes
.jpg)
The requirements for the construction and design of sports facilities take into account many factors. Given the specifics of such facilities, it is extremely important to first take into account modern requirements for them. All work is carried out taking into account:
- characteristics of a sports and technological nature, parameters that are typical for specific areas of games or classes;
- the potential growth of the part of universal buildings, multifunctional premises, which after a certain time can be reconfigured for another type of activity;
- accessibility for people with physical disabilities, taking into account special marking and equipment of sanitary and household facilities;
- opportunities for expanding the composition of such premises, for creating areas for physical culture and recreation activities and entertainment;
- requirements for the location of seats for spectators at public events and shows of various sports games.
When constructing sports facilities, it is also necessary to take into account the fact that in the future a large number of people will be in the stands in the building at the same time. According to the design, it is necessary to carry out fire safety and engineering and technical support work.
What is taken into account when designing

Briefly, the main factors taken into account when planning a sports facility can be described as follows:
- purpose of the facility;
- composition of the sports complex;
- basic requirements;
- special conditions for a particular facility;
- composition of engineering and communications;
- weather conditions during open-type operation of the facility.
Stages of construction of a turnkey sports complex

This service format is best suited for the construction of sports facilities, as it involves the performance of all works in the complex and taking into account the necessary needs of the customer.
It is also important that the facility appears to be completely ready for operation. The construction of a turnkey sports complex involves the following stages:
- Design. At this stage, the purpose of the facility, the presence of functional zones, and requirements for safety and climatic features are determined.
- Coordination. Specialists prepare project documentation, drawings, diagrams, and obtain permission from the relevant supervisory authorities.
- Preparatory work. They involve conducting geodetic and engineering-geological surveys to analyze soils and the specifics of the area.
- Site preparation. The territory is cleared of debris and vegetation. If there are old buildings, they are dismantled. The soil is leveled, and temporary roads are arranged if necessary.
- Construction of the facility. The foundation is poured - it can be strip, pile or monolithic. Next, walls are erected - a frame made of concrete, metal or wood, and ceilings are installed. After that, roofing work and facade decoration are carried out.
- Infrastructure arrangement - electricity supply, ventilation, water supply and sewage, heating system, lighting.
- Interior finishing works. They include the installation of windows, doors, flooring, arrangement of changing rooms, showers, anti-aircraft lights and other elements.
At the final stage, sports equipment is installed, exercise machines, equipment for fitness and other sports disciplines are imported, all systems of the facility are tested. Then the sports complex is prepared and put into operation by the customer.