Our craftsmen have completed:
- cleaning and removing garbage left by other "responsible" builders
- pouring strip foundation and floor slab
- erecting walls from aerated concrete
- forming door openings
- installing metal roofing
- finishing the facade with "lamb"
- installing wires and lamps
- plastering and painting walls
- installing OSB on the ceiling
- laying porcelain tiles on the floor
- installing roller blinds
- manufacturing the entrance group
- cleaning and removing garbage