Our craftsmen completed the following:
- prepared profile pipes and installed a metal frame
- installed a roof made of bituminous shingles
- made brick walls
- covered the back wall with false beams
- installed a drainage system
- installed electricity and installed lamps and sockets
- did cleaning and garbage removal
If you want to view other photos from this property, as well as see our other works, go to our main website.